Event Schedule

Please note that these dates are very much subject to change, and will likely not reflect the actual time these things take. That being said, these events will all be updated to the best possible estimate when that is available to me.

Helix R1 FC design finished ~ July 8th 2024

This will be when the design for the Helix R1 PCB is completed and ordered.

Helix R1 FC assembled ~ July 31st 2024

This is when the Helix R1 flight computer will be fully assembled and (hopefully) operational.

TVC mount and Hawk complete ~ August 20th 2024

This is when both the new TVC mount (if one is deemed needed) and the Hawk B1 (block 1) vehicle will both be fully designed and manufactured.

PID and Kalman coding and tuning complete ~ September 7th 2024

This is when the flight code for Hawk to do TVC on the way up will be complete. Code for TVC landing will still be needed.

Hawk system tests ~ September 18th 2024

This will consist of several tests of Hawk, including but not limited to parachute deploy tests, static fire tests, leg deploy tests, etc.

Launchpad complete ~ September 21st 2024

This will be when the advanced launch pad for Hawk will be completed. I have some really cool ideas in mind with pogo pins, towers, etc.

First Hawk TVC accent launches ~ September 22nd – October 2024

For more details check out the Flights page.

First Hawk landing tests ~ NET November 2024

For more details check out the Flights page.